Skip to main content
case study

Fish Farm Vessel Refit

About project

Installation design and integration of a new gyrostabilizer system onboard a 24 m fish-farm support workboat.

Our engineering team was tasked with the preliminary gyro stabiliser system evaluation study and subsequently with the integration of the selected system onto the vessel.

I am text block. Click edit button to change this text.

Results
Type:
Fish-farm workboat
Length Overall:
24.47 m
Displacement:
357 MT
Builder:
SMS Marine – UK
More info

Acting as a technical consultants to the owners through the project we oversaw the full technical integration into the vessel, comprising structural calculations and foundation drawings, electrical load balance, seakeeping and stability calculations, and onsite project supervision.

Refit also included:

  • New bilge keel design & installation
  • New harbour generator foundation design & fabrication assistance
  • Updating of stability data