Skip to main content
case study

Fish Farm Vessel Refit – Refit New deckhouse

About project

Accommodation block re-build design of a 25 m Fish-farm workboat.

NAS was responsible for the upgrade of the crew accommodation to MLC 2006 Title III Standards by designing and fully engineering the new aft superstructure for this existing vessel.

Results
Length overall:
25.50 m
Certification:
TM NCV Code
Flag:
Malta
Builder:
Nodosa – Spain
More info

The project included, local survey of the existing vessel, structural calculations and naval architectural design, and full 3D design of the superstructure, detailed cutting files and on-site supervision of the build and integration into the existing hull.